Crofton Secondary School, Fareham
Crofton is a large foundation school for 11-16 year olds serving around 1000 students from Stubbington and Fareham. The school require...
The whole flat roof area of the building was stripped and all rotten joists, timbers, and wall plates replaced. This required a full temporary scaffold roof to be erected to protect the building whilst these works were undertaken.
The roof was then completely re-felted and all lead flashings were replaced. The roof conservatory, used as a viewing point required structural strengthening and refurbishment works. Internally all the ceilings were taken down renewed plastered and decorated.
Electrics were renewed, timber handrails manufactured and fitted, doors replaced and visitor areas decorated
These works were managed carefully to enable the centre to be open for business throughout the project without compromising the health and safety of the centre staff or general public. This was achieved through careful planning, the use of segregation methods and was undertaken in very close liaison with the centre management.
Crofton is a large foundation school for 11-16 year olds serving around 1000 students from Stubbington and Fareham. The school require...
Tew Brothers commissioned to provide Planned Protective Maintenance programme over a 10 year period. Some of those items are listed.